2024/7015/XI
EC/EFTA
GB Royaume-Uni
  • B00 - CONSTRUCTION
2025-01-08
2024-10-08

Specification for footway, cycle track, paved area, kerb unit and access step construction, including both thegeneral specification and the works specific requirements which are prefixed by SI and determined on a projectby project basis by the specifier

CP 207 Instructions for specifiers for CC 207 Footway, cycle track, paved area, kerb unit and access stepconstruction

The specification for highway works is the basis of the contract documentation used by the Department forInfrastructure for new highway construction works and maintenance on the UK strategic trunk road network.This document sets out the needs of the Overseeing Organisation with respect to the overarching aspects ofthe specification, product certification and records.